Yashika, in the making
Vikram Solar · Real work The One Layer Out Gazette Management Trainee · Seven months

Manufacturing / Sales / Supply Chain

Three departments. The same answer every time.

A gigawatt-scale solar module manufacturer. Three rotations. Three very different briefs.

▶Watch the storyFix what surrounds it.

Rows of solar panels at golden hour
Image: Vikram Solar
7 monthsManagement Trainee
3 rotationsManufacturing, Sales, Supply Chain
3 briefsRecommendations presented

The story behind the slides

Three rotations, one pattern.

An illustrated short, written from this case study. Management trainee rotations. Recommendations presented, not implementation results. Illustrations, narration and music were made with AI tools; every fact comes from the case study below.

Read the transcript

Three departments. Three different languages. The same answer every time.

I spent seven months as a management trainee at Vikram Solar, a gigawatt-scale solar module maker. Manufacturing, sales, supply chain. I was the new person every eight weeks or so.

In manufacturing, the brief was to get transmission and UPS losses under two percent of total energy use. Before fixing anything, I mapped where the loss actually happened.

Not in the machines. Around them. Three part-loaded transformers, an unbalanced UPS bank, harmonic distortion, a hot room, and no real-time energy monitoring.

The recommendation was a phased fix, starting with an audit. And an honest number. The brief asked for losses under two percent. The recommendation said five to eight percent was what the equipment could realistically achieve. Repeating the target back wouldn't have helped anyone.

In sales, the question was why dealers weren't converting. I looked at the objections they actually raised. Eighty percent were commercial or service: terms, credit, response time, after-sales. Only twenty percent were about the module.

In supply chain, I compared the procurement S-O-P with how people actually worked. They'd drifted apart. The redraft made approval authority explicit, and flagged what a document can't fix, like forecasting and stockout alerts. An S-O-P nobody follows isn't a process.

By the third rotation, I saw the pattern. The technical thing was usually working. The system around it wasn't.

I wasn't there for implementation, so there are no results to show, only recommendations. But I left with a habit: look closer, question the brief, find the friction, then fix the system around it.

The brief

Rotate through three functions. Take on a live project in each. Present the recommendation at the end.

Simple enough. In Manufacturing, the brief was to reduce conversion losses and get transmission and UPS losses under 2% of total energy consumption.

In Sales, the question was simpler on paper: why weren’t dealers converting?

And in Supply Chain, the job was to rewrite the procurement SOP.

Three departments. Three completely different languages. I was new in each of them roughly every eight weeks.

What was happening

At the beginning, I treated them as three separate problems.

Energy efficiency. Dealer conversion. Procurement process.

I expected to learn three separate things. By the third rotation, I wasn’t so sure.

What wasn’t working

The technical thing was usually working. The system around it wasn’t.

In manufacturing, the losses were sitting in the infrastructure around the machines — part-loaded transformers, an unbalanced UPS bank, harmonic distortion, heat, and limited real-time monitoring.

In sales, dealer objections were mostly about commercial and service issues, not the module itself.

And in procurement, the process was running, but the document describing the process had drifted away from how people actually worked.

The “Hmm…”

Don’t just fix the thing. Fix what surrounds it. The pattern was hiding in plain sight.

Three briefs. One layer out.

Manufacturing

The brief

Reduce conversion losses and get transmission and UPS losses under 2% of total energy consumption.

One layer out

Three part-loaded transformers. An unbalanced UPS bank. Harmonic distortion. A hot room. No real-time energy monitoring.

My recommendation said 5–8% was realistically achievable.

Sales

The brief

Why weren’t dealers converting?

One layer out

80% of dealer blockers were commercial or service-related. Only 20% were about the module itself.

Terms. Credit. Response time. After-sales.

Supply chain

The brief

Rewrite the procurement SOP.

One layer out

The process was running, but the document describing the process had drifted away from how people actually worked.

Forecasting. Stockout alerts. Vendor portal. SLA tracking.

The move · 01 · Manufacturing

Find the loss before fixing it.

Co-presented with a fellow trainee.

The brief was to get transmission and UPS losses below 2%. Instead of jumping straight to a solution, I mapped where the loss was actually happening.

Three part-loaded transformers. An unbalanced UPS bank. Harmonic distortion. A hot room. No real-time energy monitoring.

Vikram Solar manufacturing facility
Image: Vikram Solar

The recommendation became a phased intervention:

  • Replace three part-loaded transformers with a single 5 MVA amorphous transformer
  • Regroup the UPS bank and introduce eco mode
  • Install active harmonic filters
  • Add an energy monitoring system
  • Improve cooling for transformer and UPS rooms
  • Introduce lithium batteries
  • Sequence the changes across four phases, starting with an audit

And then came the important part.

Because a recommendation isn’t useful if it simply repeats the number you were asked to deliver.

Sometimes the most useful thing you can tell a business is what the equipment can actually do.

Asked vs achievable

<2%The brief asked for under 2%.
5–8%My recommendation said 5–8% was realistically achievable.

Transmission and UPS losses as a share of total energy consumption. Recommended range, not an implementation result.

The move · 02 · Sales

The product wasn’t the objection.

I looked at the objections dealers were actually raising rather than the ones we assumed they would raise. Then benchmarked them against the competition.

So the question changed.

This wasn’t primarily a product problem. It was a commercial and service-design problem being reported as a sales problem.

Black-and-white close-up of a solar panel
Commercial or service-related
Terms. Credit. Response time. After-sales.
The module itself

Four kinds of friction within the 80%. No individual shares are assigned to terms, credit, response time or after-sales.

The move · 03 · Supply chain

An SOP nobody follows isn’t a process.

Co-presented with a fellow trainee.

I compared the existing procurement SOP against how procurement was actually being run. Then mapped the old and proposed processes side by side.

The redraft made approval authority explicit rather than assumed and identified the things the document itself couldn’t solve:

From document to proposed process

  1. Compare

    Existing procurement SOP against how procurement was actually being run.

  2. Map

    Old and proposed processes, side by side.

  3. Make authority explicit

    Proposed redraft: approval authority made explicit rather than assumed.

Gaps the document itself couldn’t solve:

Forecasting.

Stockout alerts.

Vendor portal.

SLA tracking.

Because rewriting a document doesn’t automatically fix the process underneath it.

The making

Three departments. Three different vocabularies. The same underlying problem.

Manufacturing · recommendation<2% / 5–8%
The brief asked for under 2%. My recommendation said 5–8% was realistically achievable.
Sales · observed objections80% / 20%
80% of dealer blockers were commercial or service-related. Only 20% were about the module itself.

The one that wasn’t a project

Host the company’s monthly open floor.

A rapid-fire session with the Managing Director, in front of the wider organisation.

It doesn’t fit neatly into a CV. But it taught me something I still think about:

The questions people will ask a founder in public are often different from the questions they ask each other.

And the gap between those two sets of questions is often where the internal communication problem lives.

The receipts

Seven months. Three rotations. Three sets of recommendations presented to the functions that owned them.

And no, I wasn’t there for implementation. So I’m not going to manufacture results that don’t exist.

Instead, these are the measures I would have tracked:

ManufacturingTransmission and UPS loss as a share of consumption, against the 5–8% realistic range rather than the original <2% target.
CAPEXPayback period because that is ultimately what would determine whether the recommendation gets approved.
SalesDealer conversion, segmented by objection type. If 80% of blockers are commercial, a commercial intervention should move that number.
Supply chainSOP adherence on audit. Because the only honest test of a rewritten process document is whether behaviour changes.

So what?

I keep finding the problem one layer out.
Different industries. Different problems. Same instinct.

Vikram Solar

The modules were good. The objections were commercial.

Vahdam

The tea was good. The margin was leaking through pricing, keyword lists, and a catalogue nobody had properly cut.

Tata Sampann

The besan was good. The bigger problem was that 25 of 40 shoppers had never heard of it.

Don’t automatically fix the thing the brief points at. First, find the thing underneath it.

Seven months wasn’t long enough to become an expert in manufacturing, sales, or supply chain. It was long enough to learn how I like to solve problems.

Look closer. Question the brief. Find the friction. Then fix the system around it.

What I’d do differently

I would have started connecting the three rotations earlier.

The pattern only became obvious by the third stint. If I’d recognised it sooner, I would have spent less time treating each brief as an isolated problem and more time asking:

What is this problem actually sitting on top of?